Old 09-23-2012, 04:46 AM
  #11  
kristakz
Super Member
 
kristakz's Avatar
 
Join Date: Oct 2011
Location: Ottawa, Ontario, Canada
Posts: 1,111
Default

I'm so happy it's finally here!. I'm working on a quilt, and hope to get most of the rows sewn today. In addition, I'm 3 months behind on a paper-pieced block of the month. I have no expectations that I can catch up completely, but I'd at least like to get 1 month done. That should be enough to keep me busy and prevent me from starting the new quilt I'm sitting here looking at, in front of my computer First things first, I need to finish something.

If I get tired of being in my sewing room, I'll assemble a backing and load a quilt on my long arm.

Here's the in-progress quilt I'm assembling.
[ATTACH=CONFIG]364822[/ATTACH]
Attached Thumbnails p9200324.jpg  
kristakz is offline