View Single Post
Old 11-22-2012, 06:45 AM
  #1065  
dungeonquilter
Super Member
 
dungeonquilter's Avatar
 
Join Date: Aug 2007
Location: Ontario, Canada
Posts: 1,006
Default

I am slowing getting caught up. I have all my 1/2 square triangles made and squared up, all my nine-patches made and all 3 diagonal stips made. Hopefully tonite and tomorrow, I can get the last clue done. Then I need to get some stuff ready for a workshop on Monday. I made a jelly roll race for the base of one project, but need to add borders on to it. I will try to post some pictures on Saturday.

I love seeing everyones progress. The combinations are just amazing. One of the reasons I love taking workshops is seeing what the rest of the class does with the same pattern.
dungeonquilter is offline