Thread: Countdown is on
View Single Post
Old 02-11-2008, 11:03 PM
  #10  
k_jupiter
Senior Member
 
k_jupiter's Avatar
 
Join Date: Dec 2006
Location: Bay area CA
Posts: 887
Default

I feel so inadequate. I only have 8 quilts in progress. But... the lap quilt is almost done, the YBR is pinned and ready to quilt, the Homeward Bound' top is a couple of hours from being complete, Amelia's quilt is about 1/3 done, all the fabric for my SW medallion quilt is bought, washed, and pressed, my one block a week paper piecing project (128 pieces per block) is now 6 weeks behind but all the fabric is bought, washed, and pressed, the Latilla quilt has all the material pressed and waiting to be cut, and only Eye Dazzler is in some sort of limbo because still every time I take it out and do another block, I realize how far in over my head I have gotten.

But I do like looking at everyones BotMs.

tim in san jose
k_jupiter is offline