Old 03-13-2013, 12:38 PM
  #2166  
Cre8tvlwyr
Senior Member
 
Cre8tvlwyr's Avatar
 
Join Date: Oct 2010
Location: Agoura Hills, CA
Posts: 926
Default

Finished a couple these last few days....
Here is J5 completed.. gave my method a few posts ago
[ATTACH=CONFIG]401540[/ATTACH]

and LS12 [wk of Jan 13] I made this the same way as TR10 a few days ago. It is a very similar block with lots of squares cut 1 3/8" so they finish 7/8" and strips cut 1 3/8" wide - most of them. for the bottom triangle I matched the 4" marks on either side of a 6" square to the straight edge of fabric and cut the triangle [a half-4"square] I machine sewed it to the assembled top to within 1/4" from end on one side, I stitched an inch or so down the other side and finished by machine. Last, I appliqued the diamonds at the top [fussy cut - managed to find a small rose in the fabric for the tiny top!]
[ATTACH=CONFIG]401541[/ATTACH]
Gus

hope to sew more this week.... but I'm enrolled in 4 classes Hand quilting from Anji Peridja tonight, "Inner Light" from Deb Karasik on Saturday [http://www.debkarasik.com/gallery-detail.php?ID=29], a teaching sampler class from several teachers at the Glendale Quilt Show Saturday night.... and lastly, through my guild, Baskets class from Gwen Marston[ http://www.gwenmarston.com/biolw/pg42basket.jpg ]
what was I thinking???? looking forward to each of them... just wish they didnt all fall within 5 days!
Attached Thumbnails dj-j5d.jpg   dj-ls12.jpg  
Cre8tvlwyr is offline