Old 03-22-2013, 06:40 AM
  #62  
CarolynMT
Senior Member
 
Join Date: Dec 2012
Location: Haverhill, MA
Posts: 498
Default

Originally Posted by petthefabric View Post
Checking in. Will be working on the table runner today.
I cheated and only am doing one of them. And had to piece it for the instructions anyhow. so today I am going to run to my local LQS for some fabric for a circle quilt I'll back/quilt it tomorrow.

Ok, I know I know how to do these braids, have made tons of them. It took me 3hrs to do that silly center I selected and about 45mins to go from center and cut fabric to trimmed up top. So dont panic. And be prepared for it to go fast once you get in the groove! I wouldnt be surprised to see everyone done tonight! at least with the topper. If that happens, I will quickly write up the instructions for that double handed quilted pot holder. If you want to make a set. I made a ton of them for christmas one year. Everyone got a table runner and pot holder
CarolynMT is offline