Old 04-05-2013, 03:46 PM
  #335  
QuilterMomma
Super Member
 
QuilterMomma's Avatar
 
Join Date: Jan 2011
Location: Eastern Washington
Posts: 6,514
Default

Going to get customer quilts done, a scrap star quilt top done and ready for quilting, binding on a few that need it, then if I get enough time, will get the triangle runner done, the 30s BOM quilt top done. Then if I am even more energetic, will quilt the 8 that are waiting on me. Wow, now I am tired. LOL
QuilterMomma is offline