Originally Posted by
GEMRM
Is there a guide or reference somewhere that tells you how long to make each leader? I mean the part that rolls up - how long do you make it? I noticed in the video that the different rails had different length leaders.
I have a Hinterberg Stretch frame and the manual that came with it had instructions on the lengths of the leaders.
I made my own leaders out of a tightly woven thin fabric and attached them to the poles with velcro. personally, i have not had an issue with the leaders collecting lint.