View Single Post
Old 05-12-2013, 01:03 PM
  #3  
Nammie to 7
Super Member
 
Join Date: Feb 2013
Location: Rapid City, SD
Posts: 4,961
Default

I work on 5 to 8 projects at a time. Right now I have a panel that I'm embellishing, also have a hand applique in the works, a quilt of valor, picking out stitches from another quilt, a block of the month with embroidery and a pieced block of the month. When I get the new patterns for the BOM I do them right away - it is too easy to put them off and then suddenly I have 6 blocks that need to be done. After the BOM's are done for the month I work on a quilt that needs piecing, then a quilt that needs quilting. In the evenings, I do the embroidery and embellishments, unless a quilt needs binding. Once I finish a quilt then I look for another project that fits into my project list - I don't want all hand work, I don't want all quilting, or piecing. By having several in the "current" pile I always have something to work on depending on my mood.
Nammie to 7 is offline