Old 06-06-2013, 02:27 PM
  #8  
BellaBoo
Power Poster
 
BellaBoo's Avatar
 
Join Date: Jan 2009
Location: Front row
Posts: 14,646
Default

101 of basic maintenance. The first thing taken off a piece of machinery is put first in line, then the second right next to it then third all the way down to the last part. Every screw, nut, washer, etc is put in the line. To assemble, the last one off goes, on first.
BellaBoo is offline