Old 09-08-2013, 12:24 PM
  #23  
ube quilting
Power Poster
 
ube quilting's Avatar
 
Join Date: Jul 2010
Location: PA
Posts: 10,703
Default

I actually have 32 on a list from cut and waiting, to half pieced and lots of finished tops. As to how many are not on the list, that is a good ? After joining the QB I was determined to start getting these done. I'm up to #9. Slow going but is is happening. Hurray! I have to find homes for them too.

Just this morning I have worked on three different quilts, One getting ready for LAM, doing some trapunto on a wall hanging for Rhonda's 4th Wall Hanging Swap and piecing another block of a half finished top. I am busy.

peace
ube quilting is offline