View Single Post
Old 12-14-2013, 11:37 AM
  #1  
SharonTheriault
Senior Member
 
SharonTheriault's Avatar
 
Join Date: Aug 2010
Location: Jackson, Georgia
Posts: 611
Smile Got behind on my BOM

I got 5 months behind on my BOM. I'm doing AMISH WITH A TWIST 2. Got to month 9 and thought "Gee that's a lot of fabric." Then I read the directions... Have to make 28 blocks! I feel like I've been cutting for days. And I still have 2 months and the border to do. Those who have made this quilt will know what I'm talking about. That's a lot of cutting 1.5" strips. Wish me luck... I want to finish the top by the end of the year.
SharonTheriault is offline