Old 12-21-2013, 10:51 AM
  #143  
ube quilting
Power Poster
 
ube quilting's Avatar
 
Join Date: Jul 2010
Location: PA
Posts: 10,704
Default

My first goal will be to finish the WH if I don't have it done by the new year. I don't want it hanging over my head and I am a slow quilter so the work on it needs to be spread out.

After the WH I want to get all my UFOs in order. there are 23 on my list to get quilted and I have no clue as to the number that are still in the piecing stage.

I want this coming year to be one of finishing the tops in waiting. All the parts are ready to go, backing and binding are waiting to be married. All I need is to get the batting and a lot of them don't even need that. I can use left over batting for the smaller quilts and piece the batting for them.

That is all I really want to do and if I get them done I will start the in progress stack.

I could use all the encouragement I can get, thanks so much. I like your idea to share the load so to speak. Lets do it!
peace
ube quilting is offline