The reason it took 9 months...well sorta...is because we had a lot of work done...but they also have to redo many things..banister took 4 tries before they got it right. Bathroom tiles 3 times. They did their own thing. They put the plumbing in the wrong place and instead of fixing it...they continued to install everything...mirror, lights, cabinet etc. needless to say we said no way everyday...well when it came time to the walk through...that was one thing of many on the list...they had to remove, rematch and fix and move it. The tiles were horrible. I am looking for a better before massive gross tile job. I think I may have deleted them...here is one[ATTACH=CONFIG]453666[/ATTACH]note the ugly green tiles