I guess I'm sort of the odd one out. Not unusual for me
I tend to have about 3 projects going at a time. That way if I need a break from quilting, I can do some piecing, or cutting or whatnot. But, I always finish the one closest to being done before starting another one. Like I usually only have one that is in cutting stage, one that is in piecing stage, and one in quilting/binding stage.
I do have various other project in the line up, and they have fabric purchased/set aside for them, but not started yet.
This winter I am going to do the SnowAlong on canuckquilter.com - patterns are free right now!!! So I am downloading them and saving them to work on over winter. It's a lot of paper piecing very small pieces so I will probably set up a "project box" for that and work on one or two snowflakes here and there between other projects. I plan to make all versions of all the snowflakes and then put them together in one big quilt. Since I imagine I'll get tired of all the itsy bitsy paper piecing I'm just going to take my time on this one and make a block or two here and there when the mood strikes.