View Single Post
Old 10-19-2014, 10:17 AM
  #2327  
miriam
Power Poster
 
Join Date: Mar 2011
Location: Somewhere
Posts: 15,506
Default

Originally Posted by Cari-in-Oly
That's one of those machines where there was a period of time between the allocation date and the actual time the machine rolled off the assembly line. More common with the 301s, 401s, etc..

Cari
it sure isn't a FW
miriam is offline