View Single Post
Old 12-26-2014, 05:08 AM
  #1  
Macybaby
Super Member
 
Macybaby's Avatar
 
Join Date: Jul 2013
Location: South Dakota
Posts: 8,137
Default Machine Shed Update

I need to get new pictures of the outside - the fascia and soffit are up, this picture was taken before that got done.



The siding is pre-primed and we'll paint it when the weather is warm again.

So, with the exterior done for the winter, we moved to the inside. Got the insulation and plastic up. Since this is an "outbuilding" we are putting all the electrical in conduit, so none is running inside the wall. (note - we follow construction methods for cold climates, so where you live it may be done differently)





Next step is to get the panel installed so we can hook the power back up.

I also have to switch gears and get some work done on the other half - so we can move the cat door to it's proper location, and shut the window! The cats will not have 24/7 access to this side.


Last edited by Macybaby; 12-26-2014 at 05:13 AM.
Macybaby is offline