View Single Post
Old 12-12-2015, 04:14 PM
  #1  
Quilty-Louise
Banned
 
Join Date: Mar 2011
Location: Colorado
Posts: 3,536
Default My mission for organizing

This is a follow up to the previous post of "My Dream Shelving"

The shelves were delivered last Sunday (Dec. 6), and I managed
to get them all assembled. it wasn't until today that I was able to
get enough stuff moved out of the way to put 2 of units into place.

There is a LONG way to go yet, but so far I am liking the end results.

Below are a couple pictures taken of some of my fabric on the shelves.
The one thing that is REAL obvious for me is that I am going to need to
get more shelves.

The first 2 pictures show my yardage and labeling.

[ATTACH=CONFIG]537902[/ATTACH]

[ATTACH=CONFIG]537903[/ATTACH]



This last picture shows 1 shelf of FQ's.

[ATTACH=CONFIG]537904[/ATTACH]

Attached Thumbnails 2015-12-12-16.48.34-medium-.jpg   2015-12-12-16.52.03-medium-.jpg   2015-12-12-16.48.45-medium-.jpg  
Quilty-Louise is offline