View Single Post
Old 12-23-2015, 07:04 PM
  #4  
quiltedsunshine
Super Member
 
Join Date: Nov 2010
Location: Utah
Posts: 2,167
Default

So, if you have a serpentine stitch, you'd select that stitch. Then take the stitch length to about 2, and the stitch width to it's widest number. Use a walking foot if you have one.
quiltedsunshine is offline