We are very close to being ready to move machines in. Cabinets are up, though I need to get some latches as most were broken and several of the doors won't stay closed on their own (they have always been that way).
And I got the curtain rods hung - for future wall hangings.
DH started working on installing the water lines. He brought in the two sinks so they can warm up. One goes in the workroom and one for the summer kitchen. They will both have grey drains, like we had before for the summer kitchen.