View Single Post
Old 02-21-2016, 11:42 AM
  #767  
jaba
Super Member
 
jaba's Avatar
 
Join Date: Jan 2011
Location: Wyoming in the summer, Florida in the winter
Posts: 7,583
Default

Not being able to load a large quilt yet on the quilting table, I'm getting lots of the table runners and mats done. They have been in the "need to quilt" basket or needs binding and sewn for a long time. This is my finishes for the last week. Good thing I can hand sew binding and they are done.[ATTACH=CONFIG]543180[/ATTACH][ATTACH=CONFIG]543181[/ATTACH][ATTACH=CONFIG]543182[/ATTACH][ATTACH=CONFIG]543183[/ATTACH][ATTACH=CONFIG]543184[/ATTACH][ATTACH=CONFIG]543185[/ATTACH][ATTACH=CONFIG]543186[/ATTACH]
Attached Thumbnails 003.jpg   001.jpg   003.jpg   004.jpg   005.jpg  

006.jpg   007.jpg  
jaba is offline