View Single Post
Old 03-11-2016, 04:38 PM
  #35  
Cam's gram
Super Member
 
Cam's gram's Avatar
 
Join Date: Mar 2013
Location: Mid Michigan
Posts: 2,891
Default

I always have several going. Right now blocks are finished for a king size quilt and am putting them on the design wall, have a scrappy quilt half put together, need to make 12 more blocks for another quilt, also have a BOM going and am almost done hand embroidering the last panel of another quilt. Also, have a quilt loaded on the longarm and have the material ready to cut out for a baby quilt. Depends on what I feel like doing, what one I work on.
Cam's gram is offline