getting closer to a sewing studio
the room addition over our garage has been in a WIP during the winter months and I'm happy to say it's getting closer to being done. The flooring was delivered before Easter and I was hoping the floor was going to be installed Friday but the flooring company is backed up. Since we are heading to California today for a two week visit with family and friends, I will just have to wait to see how it looks when I return.
[ATTACH=CONFIG]571932[/ATTACH]
there will be plenty of sunlight and the LED track lights and recessed ceiling lights will be great for wintery days and evenings. There will be doors on the knee wall cubbies once the floor is down.
[ATTACH=CONFIG]571933[/ATTACH]
[ATTACH=CONFIG]571934[/ATTACH]
Thank you to many of the suggestions you shared with me in designing the room. Joanne