Originally Posted by
wellphooey
This is a great idea, but I am confused as to what to use for the seam line: the one on top (the smaller piece) or the seam line on the bottom one, that is, drawing a new 1/4 " line on the top piece which would be 1/4" from the bottom's cut line?
When I have triangles like that, I sort of compromise - I "average" out the seam allowance for the two pieces.