View Single Post
Old 05-28-2017, 12:39 PM
  #1159  
jaba
Super Member
 
jaba's Avatar
 
Join Date: Jan 2011
Location: Wyoming in the summer, Florida in the winter
Posts: 7,583
Default

Finally have some time to post my May finishes, 3 quilts, these needed quilting and binding, 2 table spiral runners, had them sewn together but needed quilted and binding. Bill's family was all here the past 4 days for graduation. This scrappy was the last quilt his Mother was doing before she passed away. 4 kids, so I cut it in 4 pieces, quilted them and finished so each one of them could have a piece. The other 3 are on their way home with the new owners.[ATTACH=CONFIG]573753[/ATTACH][ATTACH=CONFIG]573754[/ATTACH][ATTACH=CONFIG]573755[/ATTACH][ATTACH=CONFIG]573756[/ATTACH][ATTACH=CONFIG]573757[/ATTACH][ATTACH=CONFIG]573758[/ATTACH]
Attached Thumbnails dscf3454.jpg   dscf3455.jpg   dscf3456.jpg   dscf3457.jpg   dscf3458.jpg  

dscf3460.jpg  
jaba is offline