Old 06-29-2017, 06:25 PM
  #10  
rryder
Super Member
 
Join Date: Oct 2015
Location: Va.
Posts: 5,753
Default

thanks for hosting.

I have 3 things to work on.

First, A quilt that is partly quilted-- need to decide on next threads I want to use, once that's done the quilting should go pretty quickly. Second- Unsew and resew a section of a quilt top that got cattywumpus, then get it sandwiched and ready to quilt-- it's a modern piece with lots of space for quilting, so deciding how to quilt it may take a while. Third- finish the June section of my temperature quilt.

If those things get get done I will work on the two pieces I'm doing in collaboration with another artist.

Rob

Last edited by rryder; 06-29-2017 at 06:29 PM.
rryder is offline