Old 09-14-2017, 06:36 AM
  #1587  
dublb
Super Member
 
Join Date: Apr 2010
Location: Brady TX
Posts: 6,613
Default

I have been busy too. Doing the li'le things that need to be done around the house. I also started putting the wood putty on the window frames in the entrance hall. I have also made a few more blocks for my 6" sampler. Here are a few.
[ATTACH=CONFIG]580535[/ATTACH] [ATTACH=CONFIG]580536[/ATTACH] [ATTACH=CONFIG]580537[/ATTACH]
And here is a stamp block. I am making stamp blocks to go between each sampler block.
[ATTACH=CONFIG]580539[/ATTACH]
Attached Thumbnails 52-2-blaized-trail.jpg   52-2-atlantic-seas.jpg   52-2-all-those-squares.jpg   52-week%3B-1st-stamp-block.jpg  
dublb is offline