View Single Post
Old 09-22-2017, 06:40 AM
  #46  
rvsfan
Super Member
 
Join Date: Jan 2011
Location: Las Vegas, NV
Posts: 1,398
Default

I have 9 wall hanging projects going right now, all on the front burner. I even took on 2 more and stuck them ahead of the 9, so it's really 11. All fabric is out in project stacks. My apartment looks like a fabric store. And I feel stressed.
rvsfan is offline