View Single Post
Old 11-05-2017, 08:03 AM
  #1829  
oksewglad
Power Poster
 
Join Date: Jul 2009
Location: Between the dashes of a tombstone
Posts: 12,722
Default

I'm not getting complete quilts done, but on a a quest to get projects into finished tops..do half UFO's count?...I'm working on a house quilt started in 2012. I never did get to 365 houses, but have 225+ done and over half through setting them into a large quilt. It takes a long time to sew 3" blocks into a quilt! Stitch by stitch. I also pulled out Tula Pink's sampler quilt a (2013 start) and have now finished the blocks and have a setting planned and the strip sets sewn ready for background piecing. Another top finished is a BH quilt called RicRac9's, a top that uses over 200 9P's cut from 2" squares. I feel I've been pretty productive since September...I don't think they will be compete finishes for 2017, but a good start for 2018.
oksewglad is offline