View Single Post
Old 11-06-2017, 07:51 AM
  #1  
tallchick
Super Member
 
tallchick's Avatar
 
Join Date: Sep 2011
Location: Ohio
Posts: 3,041
Default A productive week

Last week I managed to get 3 tops quilted, and 2 of them bound. I will finish the binding on the 3rd one this week and hope to get at least 1, maybe 2 quilted this week if I can keep myself motivated. My goal is to get all my tops quilted and all my scraps sorted through before I start another project. I really do enjoy longarming, so I don’t understand my procrastination on completing my projects.

1: Curved Log Cabin using the creative grids ruler, 64in square, FMQ all over meander, king tut thread, Fabric is Fancy by Lily Asbury for Moda, batting is Soft and Bright by the Warm Company.

2: Patio, Batiks from my monthly Batik subscription from Fatquarter Shop, backing is Moda Grunge in Pool, Willow hand guided edge to edge panto, King Tut thread, 64 x 84, Hobbs Cotton batting.

Thanks for looking.
Attached Thumbnails 6d6175d6-d7c7-48d8-b360-4abee971230d.jpeg   7a9571b6-7dda-4061-8c8b-6961337f0ff6.jpeg   a3c011ae-c0b8-4f51-bd25-4af100a5ca38.jpeg   21753f8f-74b7-475d-8758-75ec68ff19f7.jpeg  
tallchick is offline