Howdy y'all
The drywall is up in my new sewing room! It's really coming together quickly! The "finisher" will be here on Monday to fill in the cracks and holes, then it will be painted a coral color. Today the men are coming to take the old gutters down, replace the wood they are attached to, then replace the gutters with the downspouts running into a rain barrel. The Pergo flooring I ordered will be here on Monday, but may not be installed for a couple of weeks because the men are also building me a new, bigger chicken coop! Because of the colder weather, they are going to paint the walls of the coop inside the sewing room so the paint will dry, so the floor won't be installed until after that is completed.
Anyway, here are a couple of pictures of the drywall. The first picture is directly to the right of the door, and is where the old slide-up garage door is. They had to come in about 6" to cover the rails that the door slid up on. There will be a 10' long kitchen countertop installed in front of it with four cabinets with drawers underneath it. Enjoy!