View Single Post
Old 02-07-2018, 07:04 PM
  #207  
happylab
Super Member
 
Join Date: Jan 2011
Posts: 2,146
Default

I’m 1/2 way done with my 4-patches. I’m Alternating between this clue and BHMQ clue #3. I figure both will be done at the same time. At least that is my plan. I’m using my stash from 2.5’ blocks previously swapped.

I like the many pis, i’ll Post pics on Friday or Saturday. Too many errands to do the next 2 days. Not much time to sew.

I left peach cobbler in the club car.
happylab is offline