I’m 1/2 way done with my 4-patches. I’m Alternating between this clue and BHMQ clue #3. I figure both will be done at the same time. At least that is my plan. I’m using my stash from 2.5’ blocks previously swapped.
I like the many pis, i’ll Post pics on Friday or Saturday. Too many errands to do the next 2 days. Not much time to sew.
I left peach cobbler in the club car.