Love my cheerleaders!
Most of my projects that need done right now are just the quilting then binding. I have 18 quilts and runners to get quilted. Lots of time on feet which I have not been able to do. Most of those are easy, but I have some that I want to put into show and will take lots of quilting time on them. I still work full time job so no dedicated slots at home. Once I get caught up with customers, will tackle them. I am going to set aside a designated slot for mine. Plan is to do three customer quilts, then put one of mine on, then three, then mine. I think I can get them done that way.
Last edited by QuilterMomma; 03-02-2018 at 11:39 AM.