View Single Post
Old 04-23-2018, 04:27 AM
  #83  
Conchalea
Senior Member
 
Join Date: Aug 2015
Location: Ranger, Texas
Posts: 788
Default

Saturday I got a lot done on my 2 projects. I sewed several more string boxes and cut & sewed 36 HATs for the 19th Mystery Quilt ( my first mystery ride). I also cut all the 2.5” squares for that project. I’m a bit stuck on the large group of 108 HSTs for that quilt, because my preferred dark fabric is short the amount needed. I cut some strips for another project that didn’t get used & they’re 1/2” too narrow. I may sew them together to utilize them in this quilt. My backup fabric for it would make a great backing for this mystery so I hope to avoid cutting into it.
Sunday I went riding in our gorgeous weather. I leave this Saturday for a week to ride with my women’s motorcycle group, the Motor Maids. We’ll spend our time riding roads in northeast Texas, an area I haven’t ridden in much. I should put about 1500 miles on my bike, helping me get closer to our club’s goal of each member riding 10,000 miles per year. So, a week of no quilting!
Conchalea is offline