Thread: Boom 21 - Dunes
View Single Post
Old 06-10-2018, 03:13 PM
  #184  
GramE
Super Member
 
GramE's Avatar
 
Join Date: Feb 2016
Location: Bunker Hill, In
Posts: 1,912
Default

Originally Posted by Kassaundra View Post
I think when it comes to hand piecing an entire boom Pat (GramE) would sew me under the table.
Not sure about that, but I might give you a strong challenge. 3 months is 12 weeks, one a week, I could maybe do 12, but 19 or 20 is faster than the turtle speed I move at. I considered it before I signed up this time. I considered it because I thought it was going to be a small group. Problem is I always pick the hardest blocks to hand sew. 80 pieces per block! I’ve been working on how to get a 12 1/2” Block out of the diamonds and hexagons i’m Currently working with.

[ATTACH=CONFIG]595820[/ATTACH][ATTACH=CONFIG]595821[/ATTACH]
And my DH might like some supper occasionally in those 12 weeks.
Attached Thumbnails 89ebf441-b153-40ba-a591-74060f46d8c3.jpeg   52a5c598-3fc5-43a3-84b8-93b143fca5b3.jpeg  

Last edited by GramE; 06-10-2018 at 03:16 PM.
GramE is offline