Old 08-18-2018, 10:39 AM
  #9  
Redtop
Member
 
Join Date: Nov 2014
Posts: 81
Default

I ALWAYS have 2-3 ongoing projects. I have finished piecing 3 of those the last month for winter quilting. I have at least 12 (usually more)UFO's at a time and additional 6 tops that needs to be quilted. I hand quilt all my tops so it will take awhile, but I love every minutes of sewing time. I can sit at the quilting frame and dream away a whole afternoon. The 2-3 ongoing project---well that's not what I consider UFO's. UFO's sit on shelf for months (or years) without being looked at. I have at least 12 of those projects that haven't had a stitch added for longer than I like to admit. That's the tops I'm trying to finish and NOT start anything new. Bonnie Hunter had a leader and ender that caught I eye. With shelves full of scraps I need a scrappy something to use some of them and Bonnie's leader and ender would be prefect (please tell I'm not allowed to start another quilt).
Redtop is offline