Old 09-02-2018, 10:43 PM
  #1  
Tiny Tigger
Junior Member
 
Join Date: Apr 2018
Location: Fulton Missouri
Posts: 109
Default In progress and a new top ready to start work on

[ATTACH=CONFIG]600419[/ATTACH][ATTACH=CONFIG]600420[/ATTACH][ATTACH=CONFIG]600421[/ATTACH][ATTACH=CONFIG]600422[/ATTACH][ATTACH=CONFIG]600423[/ATTACH]

The first one is a close up of the hand quilting I am doing, the second is the back, the third is the front, the fourth is a close up of the hand embroidered butterflies on the front (think there were 42 sets of those) and then the last one is of the next quilt to be done.
Attached Thumbnails 20180903_001041.jpg   20180903_001108.jpg   20180903_001134.jpg   20180903_001155.jpg   20180903_003518.jpg  

Tiny Tigger is offline