View Single Post
Old 09-11-2018, 11:02 AM
  #18  
madamekelly
Super Member
 
Join Date: Jul 2010
Location: Central Willamette Valley, Oregon, USA
Posts: 7,695
Default

Put a little piece of doubled fabric through the needle first, and at the end. For long seams I use two, one at the beginning, and one at the end, or in between if I am “assembly line” sewing. To see how assembly line sewing works, go to YouTube and search for “Eleanor Burns, assembly line sewing”.
madamekelly is offline