I settled on this:
1. Hoop the stabilizer
2. Spray/layer the puffy batting
3. Stich the trapunto pattern
4. Trim
5. Spray/layer the cotton batting and top fabric
6. Stitch the trapunto pattern and then the fill.
My sampler:
[ATTACH=CONFIG]610850[/ATTACH]