I've gotten 2 quilts sandwiched and turned, ready to quilt.
And DH is getting the repair painting done in my quilting studio. It's been dirty and out of order since having the plumbing replaced in the house and all the repair plaster work made lots of dust. Tomorrow, we can start vacumning, moping, wet dust the walls. Then get all the stuff off the LA so I can start using it again.
Going to a retreat in 2 wks and want to take the small quilts to quilt so trying to get them all sandwiched. After that I can start diminishing my stash with more charity quilts.