View Single Post
Old 08-10-2019, 05:32 PM
  #1286  
petthefabric
Super Member
 
Join Date: Jan 2013
Location: Florida
Posts: 3,828
Default

Hi all,
Thank you for well wishes. The surgery was delayed (insurance) to Aug 27. So 2 more weeks for finishing quilts on the LA. Been putting together tops with back and binding. And putting labels on back. Found some large pieces of fabric in another cupboard, 7 yds from stash asigned to backs.
petthefabric is offline