View Single Post
Old 11-04-2019, 04:23 PM
  #10  
oksewglad
Power Poster
 
Join Date: Jul 2009
Location: Between the dashes of a tombstone
Posts: 12,716
Default

I've been sorting stuff and have a small pile of small UFO's. Today, I listed what I need to finish them, ie cut batting, backing, binding. I want to work on hand quilting 5 mini quilts during my TV watching time. At the machine I want to make a couple of small Thanksgiving items for guild rewards for finishing a large UFO. Need to have my sewing stuff all done by Thanksgiving so that takes priority over the big projects.
oksewglad is offline