View Single Post
Old 01-27-2020, 09:18 AM
  #205  
Motorcyclemad
Senior Member
 
Motorcyclemad's Avatar
 
Join Date: Mar 2011
Location: Mostly Oklahoma (Army Brat)
Posts: 606
Default

Originally Posted by NZquilter
Congratulations to everyone who made the goal!!! I'm riding in the caboose of this UFO train. I'll get a finish one day, but I'm not stressing over it yet. My life has just gotten so busy with the little ones lately. I try for 15 minutes a day sewing.
Originally Posted by WMUTeach
NZquilter, I am sitting with you in the caboose hand quilting like crazy and my UFO is moving ahead. Body of the quilt finished and now I have begun hand quilting the border. Picture to come later.

Belfreybat, absolutely love, love, love the border on your quilt for the choir leader. Perrrrfect!

I am so impressed with the number of finishes. We certain do respond to a little positive peer pressure. Now, I am wondering who has cleared their pile of UFOs from our group? Tee-Hee-Hee I am quite convinced that this group is a lifelong commitment. We may diminish the pile but it will never disappear altogether. My goal for February is two finishes! I think it can be done.

You two aren't the only ones holding down stools in the caboose.

I have been looking at three tops for the past two weeks. We still have 5 days, lets see what can be done. If only my Inspector (from my avatar) wasn't soooo needy at the moment. Even after a couple of hours at the dog park, he will still come under the sewing table and park directly on the presser foot.
Motorcyclemad is offline