View Single Post
Old 06-23-2020, 01:20 PM
  #29  
happylab
Super Member
 
Join Date: Jan 2011
Posts: 2,037
Default

I received an e-mail telling me my book has been sent. Estimated arrival July 7th to 14th. I’m really hoping it will be here sooner. So I have time to select, wash and iron my fabric. I’ll post pics of fabric after I completely decided on my fabric.

I really like the new time line and looking forward to sewing along with everyone. Until I see the book and yardage, I’ll reframe from selecting my fabric. In the mean time I will finish my 100 block challenge. (I call my 45 day challenge, which s/b be a 15 day challenge). I’m 1/2 done. 12 blocks cut out and 3 blocks I have fabric ready to cut. This projected is worked from the outside to inside. It’s 60” by 60” with out borders. Of course I’m adding borders.

then I have a few minor Easy projects for guild to make and donate next meeting in July (hopefully).
happylab is offline