View Single Post
Old 09-08-2020, 09:33 AM
  #26  
mjpEncinitas
Super Member
 
Join Date: Jul 2013
Posts: 1,684
Default

I sent my package off. Should get to Janice Friday. I didn’t realize Leaving the bags open was better. I tried to smash all the extras air out And then close them. . I sent accent pieces, although I didn’t know they could be 8x8 so mine are smaller. And I asked for extra fabric to be sent back as I ran out of the boom fabric completely. Sorry sewbiz

im really looking forward to the boom. I'm finishing up piecing A quilt made from 2 1/2” squares from all the boom fabrics. It’ll be ready for FMQ by the time the boom fabrics arrives. I like to have one piecing project and one FMQ project going at the same time. I like to go back and forth between the two. Unfortunately my sweet 16 sit down has an intermittent problem that the repair guy can’t find. I bring it to him it works, I bring it home it works one time then quits. Sigh.
mjpEncinitas is offline