Old 04-16-2021, 12:40 PM
  #19  
joe'smom
Super Member
 
Join Date: May 2013
Location: Ballwin, MO
Posts: 3,545
Default

I have organized much of my stash and bundles into planned projects, and am working on prepping, or kitting, those; I cut and sew to whatever extent is most easily stored. These prep quilts serve as my leader/ender projects. This year I have joined three BOMs (from the board's Quilting Challenges section) with the aim of using up bundles that I bought with no purpose in mind. I prefer to piece one quilt at a time, and it has proven something of a challenge to juggle these three projects at once. My normal mode is to be leader/endering a prepped quilt while piecing a main project, and basting, quilting or binding a third. I also have separate applique and hand-quilting projects, which are longer-term and worked on in the evenings.

Last edited by joe'smom; 04-16-2021 at 12:42 PM. Reason: spelling
joe'smom is offline