View Single Post
Old 09-06-2022, 03:08 PM
  #246  
happylab
Super Member
 
Join Date: Jan 2011
Posts: 2,039
Default

My progress after this weekend’s VQW.
1. Bauble Beads is quilted - just need to square and bind. Next week project.
2. Brown sampler =. I cut out the batting and just need to decide on the backing. Next project to quilt later this week.
3. Lock-in 2020 = ready to be quilted after #2 top. Next Monday. Football takes over after Thursday. Then I sew and pin on tops during these days.
4. scrappy 2.5” Halloween top = I have the 16 patches sewn. Just need to sew the sub blocks to make the 16 big blocks together. Etc, etc. etc. my goal to complete by 16th.
5. Lab in the forest #1 and forest lab #2 = need to figure out the backings. Then put in line to be quilted.
6. I added another top to quilt = I call it the wild life animals throw (at least I think it a throw size).
That should keep me busy.
happylab is offline