Old 03-11-2010, 10:04 AM
  #4  
mytwopals
Super Member
 
Join Date: Apr 2009
Posts: 3,382
Default

It takes me 1-2 hours to load one on my frame, too. That's backing, batting and top. I only pin the backing, though. Once I have the backing pinned, I roll the batting, then I sew a line across the end of the batting to attach it to the backing. I do the same for the quilt top. I do not sew through the leaders, only the backing about 1/2" off the leaders.
mytwopals is offline