View Single Post
Old 08-07-2025, 02:49 PM
  #3  
happylab
Super Member
 
Join Date: Jan 2011
Posts: 2,146
Default

Good evening Heather and other quilting members.

I’m in and my projects goals = (1) bind 2 top by machine; (2) quilt 2 baby tops; (3) join in the virtual QAL for sewing on Aloha mystery clue #1, so I’m ready for next week’s clue. (4) In my spare time iron the Hugh stacks of string fabric for my spring fling with strings QAL (it’s over), but I still want to work on it for the next few months. I like the final reveal. Oh, and lastly water my fall veggie garden. That should keep me entertained this weekend.

Tonight set up and maybe start quilting one of the baby tops. Trim one of the quilts needing binding and iron the binding for the quilt. Friday = bind 1 quilt; quilt 1 baby top and get the next one ready to quilt; iron some of my strips. Trim 1 quilt and get binding ready to sew on the quilt. Saturday = sew with the virtual QAL with cotton cut clue; sew binding on quilt #2; iron on strings and quilt another baby top. Sunday = complete ironing on my string fabric selection. And finish any projects not done before. Post some pic for show and tell.
happylab is offline