View Single Post
Old 01-07-2026, 06:13 AM
  #32  
Snooze2978
Super Member
 
Join Date: Sep 2011
Location: Carroll, Iowa
Posts: 3,980
Default

My quilting goals are to finish what I didn't finish in 2015-2025, how's that for a goal? I do have the last king size quilt on the frame now and my goal is to ge tit finished by the end of this month since I couldn't get it done for 2025 goals. Then I have another Ombre quilt but just an oversized lap quilt to go with the queen size Ombre quilt I was able to finish back in Mar-Aprl when I got my mojo back. My sister wants me to finish my French Braid quilt top that's hanging on the design wall but I'd rather get the quilt tops still hanging on the pole finished first. Plus I like to look at my French Braid hanging there when i walk by it daily. I also have a self designed quilt pattern to finish as someone would like to adopt it. It's a Tree of Life panel (Disney) with paper pieced blocks as well as regular pieced blocks going around it. My problem was the pieced sashing that went between each row of blocks as I couldn't figure out how to get them to fit but I now have a plan to fix that issue. Plus I have 2 more oversized lap quilts to make from the beginning for a couple gents in my congregation and those will finish my quilts there. So I have my goals cut out for me for this year so hopefully I can make at least half of them. I'm having a slight issue with my IQ robotics and the installer hasn't responded to my email and it's been a couple days now. I've been working around this issue for years but now I want it fixed.
Snooze2978 is offline