Old 03-23-2010, 02:55 PM
  #1613  
MadQuilter
Power Poster
 
Join Date: Mar 2009
Posts: 15,639
Default

Originally Posted by LovingIzabella
No pressure at all on anyone but we have just about 3 weeks left on this swap-how is everyone doing?
I have a bit of a dilemma:

When I first started sewing (after my work project from hell was over). I decided to do 2 blocks for each F8. One is the same for everyone and one different - depending what the fabric wanted.

Now I have 20 squishies in the post and 1 more ready to go, leaving 14.

I know that I can get the single blocks done in time, but not 2. Should I finish the single block, send it out to meet my deadline and send the second block out later?

Any input?
MadQuilter is offline